ТЭЦ-16

Назначение - комбинированная выработка электроэнергии и тепла для обеспечения потребителей Московского региона. Филиал АО «ТЭК Мосэнерго» - «Мосэнергопроект» выступил генеральным проектировщиком, выполнив весь комплекс проектно-изыскательских работ

Состав основного оборудования ПГУ-420Т:
  • Газовая турбина SGT5-4000F (Siemens)
  • Генератор газовой турбины TLRI SGen5-1000A (Siemens)
  • Паровая турбина SST5-5000 (Siemens)
  • Генератор паровой турбины TLRI SGen5-100A-2P (Siemens)
  • Котел-утилизатор
    Еп-264/297/43-13,0/3,0/0,47-558/558/297-11,6вв (ОАО «ЭМАльянс»)
  • Вентиляторная градирня ID 23000-181-6-170 (SPIG)
Мощность энергоблока ПГУ-420Т:
  • электрическая - 420 МВт
  • тепловая - 195 Гкал/ч

1920-1930

1922 – Design Bureau established under the Moscow Association of State Power Stations

The bureau’s first projects include work to increase the capacity of the Elektroperedacha power plant (today – R.E. Klasson SDPP-3) from 20 to 40 MW, expansion of SCHP-1 (P.G. Smidovich HPP-1) and HPP-2

The projects of Kashirskaya, Shaturskaya, and Novomoskovskaya power stations designed.

1927 – Diagram of the first heat supply system of Moscow developed.

1930
1930-1940

1931 – The first heat pipeline in Moscow with a length of 6 km from SCHP-1 designed and laid

In 1933, the Design Bureau was merged with an electric networks design bureau.

1935 – The first 220 kV transmission line system Novomoskovskaya SDPP- Moscow was built;

Frunzenskaya CHP (today - CHP-12), Stupinskaya CHP (CHP-17) being designed; previously commissioned facilities expanded.


1940
1940-1950

October 1941 – the bureau closed, most of the employees sent away to the war

In December of 1941, the bureau resumed its work.

1941-1945 – design of air defense facilities for existing stations and substations. The development of temporary constructions in the event of the destruction of system parts. Designing of mobile power stations – powertrains with a capacity of 500-1500 kW for the restoration of damaged power supply and the power supply of relocated industrial enterprises.


1950
1950-1960

December 1949 – Teploset and Moscow Cable Network joined the Design Bureau. Mosenergo Design Bureau transformed into the Mosenergoproekt Institute

1950-1960s – CHP–16 launch, CHP-22 first power unit was put into operation. Designing of new substations: Sofrinskaya, Rostokinskaya, and Novospasskaya.

1960
1960-1970
CHP-21 first power unit, and CHP–23 first power unit were put into operation.
1970
1970-1980

1972 – a unique major unit with a capacity of 250 thousand kW, which has no analogs in the world, with the T-250 heating turbine for supercritical steam parameters designed and put into operation. The major unit was installed on CHP-21, 22, and 23.

1980
1980-1990

Focus on the design of cost-efficient gas turbine plants and modernization of the existing power stations.

1990
1990-2000

Putting into operation of CHP-27 first power unit. Designing of substations of the 3rd transport ring, Moscow City, Novo-Mazilov, Bitza, and Kurkino. Putting into operation of Khapilovskaya and Yuzhno-Izmaylovskaya pump stations.

2002
2002-2006

Work on the projects of Zhulebino, Tushino-5, and Tereshkovo district thermal stations.

2007
2007

Mosenergoproekt incorporated into TEK Mosenergo.

2010
2010-2014

2010 – designing of new power units for CHP-12, CHP-16, and CHP-20.

2012 – Putting into operation of the Olympic facility of Adler TPP.

2014
2014-2018

2014-2015 – Putting into operation of CHP-16 steam power unit and steam power units at the Serovskaya SDPP and CHP-12.

2016 – founding of diversified enterprise Mosenergoproekt Limited Liability Company

2016-2018 – design and construction of the Groznenskaya TPP and Molzhaninovskaya substation